Jump to content

Recommended Posts

Posted (edited)

Hi everyone. I need help with iQ-R system. Is it possible to connect an additional expansion bus to an existing system without powering down?

Also, can I install new I/O module (RX40C4) to an existing system at hot state (like a hot swap)?

Edited by CSEngineer

Posted

No and No.  You will need to update the I/O Map in the controller to add more modules, and this cannot be done without stopping the CPU and downloading an updated project.  And modules should not be removed under power, you will error out the CPU and crash the line.

Posted
6 hours ago, Crossbow said:

No and No.  You will need to update the I/O Map in the controller to add more modules, and this cannot be done without stopping the CPU and downloading an updated project.  And modules should not be removed under power, you will error out the CPU and crash the line.

So I need stopping CPU or shutdown all system?

Posted

Depends what duties that CPU is doing in your system.  It is common for the duties to be critical, so total production stoppage is normal for CPU stop.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...