Jump to content

Recommended Posts

Posted
Hello all. I am working on my first project with Mits. I was wondering if there was a way to test my E700 program with my PLC Program without having any hardware connected. I basically am just looking to simulate both. Any help is Greatly appreciated. Mike
Posted
Yes and No! You can test the PLC logic by using GX Simulator which is an add on component of GX/GXIEC Developer, often referred to as Ladder Logic Test in the menu structure. As for the E700, the only way to test it is on the terminal, I do not know of a simulator for Beijers terminals. If you were using the latest model HMI's (the E1000 series) there is a test run / simulation package in-built within e-designer
Posted
The only way to test a project on E700 terminal without plc, is to use the internal driver of E terminal. Bye Max

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...